DestinyTRADES
Products
Services
Industries
China to Nepal
Government
About
Products

Electronics and Electrical sourced from China for Nepal buyers

Cables, lighting, panels, CCTV, components and power equipment for Nepal contractors, distributors and institutions.

Destiny Trades sources electronics and electrical from verified Chinese manufacturers for distributors, contractors, infrastructure companies, construction companies and retailers across Nepal.

We test insulation, conductor size, IP rating and function; serial numbers are recorded for warranty. Typical MOQ: From 1 carton for accessories; 1 unit for panels and transformers. Lead time: 15–35 days production, plus 12–25 days transit.

Electronics and Electrical categories

Batteries and Power Supplies

Batteries and Power Supplies: UPS, Lead-acid batteries and Switching power supplies.

View products →

Cables and Wires

Cables and Wires: House wiring cable, Armoured power cable and Coaxial cable.

View products →

CCTV and Security

CCTV and Security: IP cameras, NVR and PTZ cameras.

View products →

Consumer Electronics

Consumer Electronics: LED televisions, Bluetooth speakers and Power banks.

View products →

Electrical Equipment

Electrical Equipment: MCBs and RCCBs, Contactors and Energy meters.

View products →

Electrical Panels and Distribution

Electrical Panels and Distribution: Distribution boards, LT panels and Meter boxes.

View products →

Electronic Components

Electronic Components: PCB assemblies, Resistors and capacitors and Microcontroller boards.

View products →

Lighting

Lighting: LED bulbs, LED panel lights and Floodlights.

View products →

Motors and Drives

Motors and Drives: Induction motors, VFD drives and Gear motors.

View products →

Networking and Communication Equipment

Networking and Communication Equipment: Network cabinets, Cat6 cable and Patch panels.

View products →

Switches and Electrical Accessories

Switches and Electrical Accessories: Modular switches, Sockets and Smart switches.

View products →

Transformers and Power Equipment

Transformers and Power Equipment: Distribution transformers, Diesel generators and Isolators and fuses.

View products →

Featured products

Representative items from each category. Specifications, branding and packaging can be customised.

UPS

  • Online, 1–10 kVA
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

House wiring cable

  • Copper, 1.5–6 mm²
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

IP cameras

  • 4–8 MP, PoE
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

LED televisions

  • 32–75 inch smart
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

MCBs and RCCBs

  • 6–63 A
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

Distribution boards

  • 4–24 way
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

PCB assemblies

  • Custom SMT
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

LED bulbs

  • 5–50 W, B22/E27
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

Induction motors

  • IE2/IE3, 0.37–75 kW
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

Network cabinets

  • 6–42U
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

Modular switches

  • 1–4 gang
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

Distribution transformers

  • 11 kV, 50–1000 kVA
  • Function tested before packing
  • Serial numbers logged for warranty
MOQ: From 1 carton for accessories; 1 unit for panels and transformersLead time: 15–35 days production, plus 12–25 days transit
Request a quote for this →

Sourcing electronics and electrical with us

01

Verified manufacturers

Factories chosen for electronics and electrical capability and export record.

02

Quality checks

We test insulation, conductor size, IP rating and function; serial numbers are recorded for warranty.

03

Certifications

CE / RoHS / CB; IEC test reports for power equipment.

04

Landed-cost quotes

Product, freight, duties and delivery itemised before you order.

Frequently asked questions

What is the minimum order for electronics and electrical?

From 1 carton for accessories; 1 unit for panels and transformers. Mixed orders across subcategories can be consolidated.

How long does it take to get electronics and electrical to Nepal?

15–35 days production, plus 12–25 days transit. Air freight is available for urgent orders.

Which certifications can you provide?

CE / RoHS / CB; IEC test reports for power equipment. Ask us for the documents your buyers or regulators require.

Ready to source from China?

Share your requirement and get a landed-cost quote — product, freight, duties and delivery to your door in Nepal.

Request a quote