DestinyTRADES
Products
Services
Industries
China to Nepal
Government
About
Products

Construction and Hardware sourced from China for Nepal buyers

Building materials, hardware, plumbing, tools and safety equipment for Nepal contractors and project sites.

Destiny Trades sources construction and hardware from verified Chinese manufacturers for construction companies, contractors, infrastructure companies, real estate companies and wholesalers across Nepal.

We verify material grade, thickness, coating and dimensions against your drawings or samples. Typical MOQ: 1 pallet or mixed container; 1 unit for equipment. Lead time: 15–35 days production, plus 15–30 days transit.

Featured products

Representative items from each category. Specifications, branding and packaging can be customised.

Aluminium composite panels

  • 3–4 mm, PVDF coated
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Concrete mixer

  • 350 L diesel
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Door hinges

  • SS304, ball bearing
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Hex bolts and nuts

  • Grade 8.8, zinc plated
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Combination spanner set

  • Cr-V, 8–24 mm
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Cabinet hinges

  • Soft close, 35 mm cup
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Chain hoists

  • 1–5 t manual
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Smart door lock

  • Fingerprint + PIN
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

PPR pipes and fittings

  • PN16–PN25
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Cordless drill

  • 20 V, 2 batteries
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Safety helmets

  • HDPE, ratchet
  • Dimensions matched to BOQ or drawings
  • Palletised or crated for heavy cargo
MOQ: 1 pallet or mixed container; 1 unit for equipmentLead time: 15–35 days production, plus 15–30 days transit
Request a quote for this →

Sourcing construction and hardware with us

01

Verified manufacturers

Factories chosen for construction and hardware capability and export record.

02

Quality checks

We verify material grade, thickness, coating and dimensions against your drawings or samples.

03

Certifications

ISO 9001 factories; GB / ASTM / EN standards where specified.

04

Landed-cost quotes

Product, freight, duties and delivery itemised before you order.

Frequently asked questions

What is the minimum order for construction and hardware?

1 pallet or mixed container; 1 unit for equipment. Mixed orders across subcategories can be consolidated.

How long does it take to get construction and hardware to Nepal?

15–35 days production, plus 15–30 days transit. Air freight is available for urgent orders.

Which certifications can you provide?

ISO 9001 factories; GB / ASTM / EN standards where specified. Ask us for the documents your buyers or regulators require.

Ready to source from China?

Share your requirement and get a landed-cost quote — product, freight, duties and delivery to your door in Nepal.

Request a quote