DestinyTRADES
Products
Services
Industries
China to Nepal
Government
About
Appliances

Heating and Cooling from China, delivered to Nepal

Source heating and cooling — oil-filled radiator, split air conditioner and air cooler — from verified factories, with inspection and customs handled.

Heating and Cooling we source

Representative products. Tell us your specification and we will match factories and models.

Oil-filled radiator

  • 9–13 fin, thermostat
  • OEM branding and colour boxes available
  • 1-year spare parts kit option
MOQ: 50–200 units per model for private label; lower for stock modelsLead time: 25–40 days production, plus 12–25 days transit
Request a quote for this →

Split air conditioner

  • 1–2 ton inverter
  • 1-year spare parts kit option
  • Drop-tested export cartons
MOQ: 50–200 units per model for private label; lower for stock modelsLead time: 25–40 days production, plus 12–25 days transit
Request a quote for this →

Air cooler

  • 40–80 L tank
  • Drop-tested export cartons
  • User manual in English
MOQ: 50–200 units per model for private label; lower for stock modelsLead time: 25–40 days production, plus 12–25 days transit
Request a quote for this →

Infrared heater

  • 1–2 kW, tip-over cut-off
  • User manual in English
  • 220–240 V / 50 Hz, Nepal-compatible plugs
MOQ: 50–200 units per model for private label; lower for stock modelsLead time: 25–40 days production, plus 12–25 days transit
Request a quote for this →

Electric water heater

  • 15–50 L storage
  • 220–240 V / 50 Hz, Nepal-compatible plugs
  • OEM branding and colour boxes available
MOQ: 50–200 units per model for private label; lower for stock modelsLead time: 25–40 days production, plus 12–25 days transit
Request a quote for this →

We source heating and cooling for retailers, distributors and hotels in Nepal, including oil-filled radiator, split air conditioner, air cooler, infrared heater and electric water heater.

We run power-on tests, check plugs and voltage, and inspect cartons for transit strength. Certifications: CE / CB certification available for most models.

01

Factory-direct sourcing

Compare heating and cooling offers from several verified manufacturers.

02

Specification matching

Example: Oil-filled radiator — 9–13 fin, thermostat. Ratings, sizes and materials confirmed before order.

03

Inspection before shipping

We run power-on tests, check plugs and voltage, and inspect cartons for transit strength.

04

Consolidated delivery

Combine with other categories in one shipment to Nepal.

Frequently asked questions

What is the minimum order for heating and cooling?

50–200 units per model for private label; lower for stock models.

How long does delivery of heating and cooling take?

25–40 days production, plus 12–25 days transit.

Can I get samples of heating and cooling?

Yes. We collect samples from shortlisted suppliers and send them to Nepal together, so you can compare before ordering.

Ready to source from China?

Share your requirement and get a landed-cost quote — product, freight, duties and delivery to your door in Nepal.

Request a quote